Reduction in time for proof-of-delivery (PoD) submissions (7 days to 3 days)
Increased adoption of technology by LSPs and drivers
Dalmia cement operates a manufacturing capacity of more than 35 MnT per annum (MTPA), across 14 cement plants and grinding units which are spread across 10 states. Due to the tech limitations and drivers inability to adopt new technologies, they were facing challenges in the quality and time taken for the POD submissions.
Learn how Freight Tiger’s multi-modal ePODs allowed both Dalmia and their transport companies to track and verify their single stop or multiple stop deliveries digitally and on time. This resulted in reduction of POD submission from 7 days to 3 days.
To know more about how Freight Tiger solved these challenges, get the comprehensive case study now
Download Case Study for Free